82-18-7 |
Canadair |
Modify stall protection sys | CL-600 (SN 1005 thru 1023) |
82-18-6 |
Canadair |
Replace control cables on air-driven generator | CL-600 (SN 1005 thru 1017) |
82-18-4 |
Aerospatiale |
Periodically inspect main gearbox | SA-330F, G, J |
82-18-3 |
Canadair |
Rerig rudder anti-jam mechanisms | CL-600 |
82-18-11 |
Partenavia |
Inspect control wheel shaft joints | P68, B (SN 1 thru 86) |
82-18-1 |
Embraer |
Install fuel filler neck kits | EMB-110P1, 2 (SN 11001 thru 110339) |
82-17-4 |
Bell |
Superseded by 85-26-6 |
82-17-3 |
Sikorsky |
Modify rotor brake | S-76A |
82-17-1 |
Hughes |
Ultransonic inspect transmission output shaft | 369D |
82-16-9 |
Enstrom |
Rework main rotor blade grips each 200 hrs | F-28A, C, F; 280, C, F |
82-16-7 |
Hiller |
Clean & inspect torsional coupling assembly each 50 hrs | UH-12E series |
82-16-6 |
Bell |
Inspect main rotor spar doubler each 25 hrs | 222 |
82-16-5 |
Piper |
Superseded by 13-10-4 |
82-16-12 |
Bell |
Install flow kit on Chadwick C-22 aux fuel sys | 206 series |
82-16-1 |
Falcon |
Superseded by 84-2-2 |
82-15-7 |
Robinson |
Replace tail rotor driveshaft assembly | R-22 (SN 0002 thru 0282) |
82-15-6 |
Embraer |
Superseded by 82-20-2 |
82-15-3 |
Hughes |
Inspect idler pulley bracket each 100 hrs | 269 series |
82-15-2 |
Hiller |
Supersedes 82-10-6 | replace attach bolts on clutch | UH-12 series |
82-15-1 |
Hughes |
Revised 7/82 | rework transmission | 269A, A1, B; 269C (SN 001 thru 1074) |