86-15-3 |
Mitsubishi |
Supersedes 80-18-12 | magnetic flux inspect nose gear strut | approx cost $660 | MU-2B, -10, -15, -20, -25, -26, -30, -35, -36, -36A |
86-15-2 |
Falcon |
Replace actuators in block of crossfed valve | 50 (SN 24 thru 162) |
86-15-10 |
Eurocopter |
Superseded by 00-20-19 |
86-14-8 |
BAe |
Install layshaft in stall system | approx cost $320 | BAe 125-800A |
86-14-7 |
Sikorsky |
Inspect or replace yaw control push rod | S-76, S-76B thru SN 760319 |
86-14-6 |
BAe |
Replace heat-sink sub assembly | BAe 125-800 |
86-14-3 |
Falcon |
Modify refuel connector guide rod | approx cost $250 | 50 |
86-14-2 |
IAI |
Superseded by 89-12-8 |
86-14-1 |
Sperry |
Modify AHZ-600 AHRS | installed on but not limited to BAe 125-800, Cessna 650 |
86-13-4 |
Cont Eng |
Revised 2/88 | pressure-check ea 50 hrs or replace cylinders | IO-520, GTSIO-520, TSIO-520, IO-520 |
86-13-3 |
Falcon |
Check & revise slat selector valve | 10 (SN 1 thru 206) |
86-13-1 |
PZL-Melex |
Repetitively inspect prop control or comply w/MBD K/02.070/84 | PZL M18 thru SN 1Z012-40 |
86-12-6 |
Bell |
Replace main rotor yoke each 2,500 hrs | 214ST |
86-12-2 |
Garrett |
Superseded by 89-7-7 |
86-12-1 |
Bell |
Repetitively check main rotor collective control | 214ST |
86-11-7 |
Cessna |
Modify circuit breaker on Soloy conversion | U206G, TU206G |
86-11-5 |
Garrett |
Superseded by 01-23-9 |
86-10-8 |
Fairchild |
Replace elevator gust lock system | SA226, SA227 series |
86-10-5 |
P&W Eng |
Before 5000 cycles, replace PT6-41 eng (thru SN93804) 1st stage compressor hub |
86-10-4 |
Avco Lyc |
Install gas producer blade dampeners | LTP-101; LTS-101 series |